Sheffield Wildlife Trust Treeton Waverley

Case study

Sheffield Wildlife Trust Treeton Waverley

Treeton Waverley habitat and watercourse works for Sheffield Wildlife Trust

ClientSheffield & Rotherham Wildlife Trust
SectorHabitat conservation and wetlands
Project typeHabitat and watercourse works
LocationTreeton Waverley
01

Scope

On the outskirts of Treeton and Waverley, the River

Rother winds alongside Catcliffe Flash Nature

Reserve. Having been extensively straightened through industrial use and disconnected from its floodplain, the aim of the project was to re-establish approx. 1km length of the river to a more natural form.

Located in a suburban area on the boundary

between Sheffield and Rotherham, close to the M1 motorway it was also necessary to liaise with the various authorities to ensure compliance with all the necessary permits and legislative obligations.

Working in partnership with designers and the

Environment Agency, Sheffield and Rotherham

Wildlife Trust developed a design. Using a series of berm, or bench, features and bank re-profiling flow conditions along the river were to be altered together with the installation of pre-seeded erosion control matting to the re-profiled banks. Footpath re-positioning and public access were also key features. Further improvements are also planned to the Orgreave Weir to improve fish passage.

Visitors to the nature reserve, river and fishing pegs

during the period were not restricted and due care had to be taken, particularly to dog walkers and animals off the lead. Cross Section Detail Design

Berm/Bench Berm/Bench

Design Visual Installation

02

Key Aspects

TREETON & WAVERLEY Given the river is located within developed areas

alongside a wildlife nature reserve it was necessary

RIVER ROTHER RESTORATION PROJECT

to access the site from a main road with heavy Client: Sheffield & Rotherham Wildlife Trust plant and machinery in a very carefully controlled manner to minimise any impact on the surrounding Duration: 3 weeks environment. Scope:

On the outskirts of Treeton and Waverley, the River

Rother winds alongside Catcliffe Flash Nature

Reserve. Having been extensively straightened through industrial use and disconnected from its floodplain, the aim of the project was to re-establish approx. 1km length of the river to a more natural form.

Located in a suburban area on the boundary

between Sheffield and Rotherham, close to the M1 motorway it was also necessary to liaise with the various authorities to ensure compliance with all the necessary permits and legislative obligations.

Working in partnership with designers and the

Environment Agency, Sheffield and Rotherham

Wildlife Trust developed a design. Using a series of berm, or bench, features and bank re-profiling flow conditions along the river were to be altered together with the installation of pre-seeded erosion control matting to the re-profiled banks. Footpath re-positioning and public access were also key features. Further improvements are also planned to the Orgreave Weir to improve fish passage.

Visitors to the nature reserve, river and fishing pegs

during the period were not restricted and due care had to be taken, particularly to dog walkers and animals off the lead. Cross Section Detail Design

Berm/Bench Berm/Bench

Design Visual Installation

03

Project Images

Sheffield Wildlife Trust Treeton Waverley supporting image 4
Sheffield Wildlife Trust Treeton Waverley supporting image 5
04

Challenges

may sink.

Utilities Liaison Biosecurity & Environmental Concerns

Following surveys, certain utilities were found to be Moving machinery from one property to another present and in particular overhead power lines often requires biosecurity and environmental posed issues, which needed to be accommodated. protocols to minimise transfer of contaminants or invasive species such as black grass. This is

Segregation particularly important when working in protected

Works often entailed footpath restrictions and sites such as conservation areas, nature reserves diversions to protect or segregate the public whilst or Sites of Special Scientific Interest (SSSI). maintaining good relationships with visitors to the reserve. Communication of any anticipated Working with Water inconvenience was undertaken at the earliest Working in or around water poses hazards for opportunity as part of the project programming. employees arising from the natural environment.

Health & Safety The presence of vermin and exposure to

leptospirosis twinned with the possibility of All workings were carried out compliantly under drowning, all add to the normal risks involving CDM 2015 protocols requiring Construction Phase accidents concerning machinery and moving parts.

Plans together with comprehensive assessment of

all risks and method statements to minimise risks Pumping out of accumulating / rising ground water for all work elements. is often necessary to ensure safe working conditions.

Sweeting Bros Ltd are unique in that we have

invested in mountain rescue sleds and equipment Monitoring weather conditions and anticipated to facilitate patient evacuation in the event of an rainfall all play key factors in programming and accident. Our work is often in secluded, delivery of the project. inaccessible areas with very poor ground conditions such that ambulances or a helicopter