Sheffield Wildlife Trust Treeton Waverley
Case study
Sheffield Wildlife Trust Treeton Waverley
Treeton Waverley habitat and watercourse works for Sheffield Wildlife Trust
Scope
On the outskirts of Treeton and Waverley, the River
Rother winds alongside Catcliffe Flash Nature
Reserve. Having been extensively straightened through industrial use and disconnected from its floodplain, the aim of the project was to re-establish approx. 1km length of the river to a more natural form.
Located in a suburban area on the boundary
between Sheffield and Rotherham, close to the M1 motorway it was also necessary to liaise with the various authorities to ensure compliance with all the necessary permits and legislative obligations.
Working in partnership with designers and the
Environment Agency, Sheffield and Rotherham
Wildlife Trust developed a design. Using a series of berm, or bench, features and bank re-profiling flow conditions along the river were to be altered together with the installation of pre-seeded erosion control matting to the re-profiled banks. Footpath re-positioning and public access were also key features. Further improvements are also planned to the Orgreave Weir to improve fish passage.
Visitors to the nature reserve, river and fishing pegs
during the period were not restricted and due care had to be taken, particularly to dog walkers and animals off the lead. Cross Section Detail Design
Berm/Bench Berm/Bench
Design Visual Installation
Key Aspects
TREETON & WAVERLEY Given the river is located within developed areas
alongside a wildlife nature reserve it was necessary
RIVER ROTHER RESTORATION PROJECT
to access the site from a main road with heavy Client: Sheffield & Rotherham Wildlife Trust plant and machinery in a very carefully controlled manner to minimise any impact on the surrounding Duration: 3 weeks environment. Scope:
On the outskirts of Treeton and Waverley, the River
Rother winds alongside Catcliffe Flash Nature
Reserve. Having been extensively straightened through industrial use and disconnected from its floodplain, the aim of the project was to re-establish approx. 1km length of the river to a more natural form.
Located in a suburban area on the boundary
between Sheffield and Rotherham, close to the M1 motorway it was also necessary to liaise with the various authorities to ensure compliance with all the necessary permits and legislative obligations.
Working in partnership with designers and the
Environment Agency, Sheffield and Rotherham
Wildlife Trust developed a design. Using a series of berm, or bench, features and bank re-profiling flow conditions along the river were to be altered together with the installation of pre-seeded erosion control matting to the re-profiled banks. Footpath re-positioning and public access were also key features. Further improvements are also planned to the Orgreave Weir to improve fish passage.
Visitors to the nature reserve, river and fishing pegs
during the period were not restricted and due care had to be taken, particularly to dog walkers and animals off the lead. Cross Section Detail Design
Berm/Bench Berm/Bench
Design Visual Installation
Project Images


Challenges
may sink.
Utilities Liaison Biosecurity & Environmental Concerns
Following surveys, certain utilities were found to be Moving machinery from one property to another present and in particular overhead power lines often requires biosecurity and environmental posed issues, which needed to be accommodated. protocols to minimise transfer of contaminants or invasive species such as black grass. This is
Segregation particularly important when working in protected
Works often entailed footpath restrictions and sites such as conservation areas, nature reserves diversions to protect or segregate the public whilst or Sites of Special Scientific Interest (SSSI). maintaining good relationships with visitors to the reserve. Communication of any anticipated Working with Water inconvenience was undertaken at the earliest Working in or around water poses hazards for opportunity as part of the project programming. employees arising from the natural environment.
Health & Safety The presence of vermin and exposure to
leptospirosis twinned with the possibility of All workings were carried out compliantly under drowning, all add to the normal risks involving CDM 2015 protocols requiring Construction Phase accidents concerning machinery and moving parts.
Plans together with comprehensive assessment of
all risks and method statements to minimise risks Pumping out of accumulating / rising ground water for all work elements. is often necessary to ensure safe working conditions.
Sweeting Bros Ltd are unique in that we have
invested in mountain rescue sleds and equipment Monitoring weather conditions and anticipated to facilitate patient evacuation in the event of an rainfall all play key factors in programming and accident. Our work is often in secluded, delivery of the project. inaccessible areas with very poor ground conditions such that ambulances or a helicopter