East Halton Wet Grassland Creation

Case study

East Halton Wet Grassland Creation

Wet grassland creation, water control and habitat works on the banks of the River Humber at East Halton.

ClientAble UK
SectorHabitat conservation and wetlands
Project typeWet grassland creation
LocationEast Halton
01

Scope

Situated on the banks of the River Humber, the East Halton wet grassland project took shape during the course of 2018.

A design involving a network of earth scrapes over a 44 hectare site with an interlinked framework of drainage ditches and water control structures, this ambitious project sought to provide additional habitat for flora, fauna and wildlife.

This project encompassed:

  • Existing live watercourse management.
  • Earth bund formations.
  • Ditch excavations.
  • Earth scrapes to designed plan.
  • Inlet reservoir creation.
  • Wind turbine installations.
  • Culverts.
  • Hedgerow removal.
  • Footbridge installation.
  • Landscaping, planting & seeding.
  • Sheet piling.
East Halton wet grassland site plan
02

Key Aspects

Water Control Structures & Management

A series of water control structures were planned as part of the design involving weirs, wind turbine pumping, valves and pipework to ensure the water supply was adequately managed and distributed.

Efficiency

Part of this project placed importance on adherence to programme and to a certain extent, to expedite it. To this end, Sweeting Bros Ltd invested in bespoke designed excavation buckets, to replicate the scrape profile and improve efficiency and timing during the works which spanned a 44 hectare site.

Video: https://www.youtube.com/watch?v=wLS7MrCt8QQ

Water-control structure at East Halton wet grassland
Plan view of flow bifurcation

Wind turbine pump installation

Wind turbine pump installation

Bespoke angled bucket to increase efficiency and programme

Bespoke angled bucket to increase efficiency and programme
03

Challenges

Health & Safety

All workings were carried out compliantly under CDM 2015 protocols requiring Construction Phase Plans together with comprehensive assessment of all risks and method statements to minimise risks for all work elements.

Sweeting Bros Ltd are unique in that we have invested in mountain rescue sleds and equipment to facilitate patient evacuation in the event of an accident. Our work is often in secluded, inaccessible areas with very poor ground conditions such that ambulances or a helicopter may sink.

Working with Water

Working in or around water poses hazards for employees arising from the natural environment. The presence of vermin and exposure to leptospirosis twinned with the possibility of drowning, all add to the normal risks involving accidents concerning machinery and moving parts.

Pumping out of accumulating / rising ground water and the management of existing live watercourses using cofferdams, stoplogs and over pumping is often necessary to ensure safe working conditions.

Dust Management

In very dry conditions, earth moving can generate significant dust nuisance to surrounding areas and it is necessary to deal with this.

Unexploded Ordnance

When excavating in certain areas, it is necessary to undertake unexploded ordnance surveys and develop a protocol for dealing with any should any come to be found.

Nearby Hull was the most heavily bombarded city/town in the UK by the Luftwaffe during World War II, making almost half the city’s population homeless and 95% of all homes damaged. Surrounding areas were also heavily bombed, possibly in error due to decoys with many not found and now lying dormant.

Sweeting Bros Ltd have significant experience over the last 50 + years of managing this risk.

Water-control structure during East Halton wetland works
Watercourse works at East Halton wet grassland